TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

UK Wide Coverage

Our soil stabilisation and lime stabilisation services have been provided across the whole of the UK, some of the locations are listed below with examples of the work carried out in your area.

 

Soil Stabilisation Cheshire

Soil Stabilisation in Cheshire

There have been many contracts throughout Cheshire where we have applied Soil Stabilisation techniques, including:

Daresbury Park, Runcorn - the works we carried out consisted of Lime Modification to the Bulk Fill giving a CBR of 5% material and Soil Stabilisation to provide a Stabilised Capping Replacement with a 15% CBR.  A case study for the full works can be found here.

Riverside House, Center Park, Warrington - on this site we provided Lime Modification to stockpiled material, all of which had varying degrees of lime addition requirements for the material to be used a Bulk Fill. For more details you can find the case study on this contract here.

Birchwood Park, Warrington - here we carried out Soil Stabilisation to provide a Sub-Base Replacement with a CBR of 30%.  The case study on this contract can be found here.

Other developments around Cheshire where Soil Stabilisation has been carried out include:

  • Cheshire Oaks
  • Manor Park, Daresbury, Runcorn
  • Winsford Industrial Estate
  • Runcorn Thermal Power Station
  • Lakeside Drive, Center Park, Warrington
  • Alderley Edge Bypass
  • Stublach Gas Storage, Northwich
  • Admiral Business Park, Northwich
  • Wrexham Industrial Estate
  • Airproducts, Crewe
  • Congleton Retail Park
  • Stobart, Warrington Distribution Centre
  • Stobart Rail, Widnes
  • Tesco, Widnes
  • Cheshire College Artificial Sports Pitches