TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Posts Tagged soil sampling

Lime and Cement Stabilisation Case Study

Lime and Cement Stabilisation Case Study Another new Case Study has been uploaded to our web-site for the works carried out at St. Helens.  The case study features information on the project including why the work was required, how the Soil Stabilisation works were carried out, how much material was treated and the specialty Soil [...]


Read more →

Soil Stabilisation Case Study

A Soil Stabilisation case study has now been uploaded to our web-site for the works we carried out at Market Drayton.  A copy of the case study can be seen below, but if you visit the case study section of our web-site you will see many more photos from the site.  Lots of other case [...]


Read more →

Soil Stabilisation Photos

Soil Stabilisation photos below showing works at a number of our sites including: Lime Stabilisation at Altham Lime Stabilisation and Cement Stabilisation at Manchester Airport Soil Stabilisation at Market Drayton


Read more →

Soil Stabilisation Newsletter

Soil Stabilisation Newsletter Our monthly newsletter was produced yesterday, detailing Soil Stabilisation, Cement Stabilisation and Lime Modification works that have been taking place throughout the UK during the first part of August.  The newsletter, which you can receive by sending us an email to sales@trstabilisation.co.uk requesting to be added to our mailing list, contains information [...]


Read more →

Soil Stabilisation in Lancashire

Soil Stabilisation is being carried out by ourselves on 2 sites in Lancashire this morning. The first site, which is a new contract for ourselves, is for an existing client whom we have carried out Bulk Earthworks, Lime Modification and Cement Stabilisation for on several occasions in the past.  This new project is for an [...]


Read more →

Lime Modification Case Study

Lime Modification case study uploaded to our web-site today detailing the Lime Stabilisation works carried out at the Hallfield Road, York contract. The works, which we completed last week, consisted of treating the existing site material (which was extremely wet) with measured quantities of Quicklime (as determined by the design testing works carried out) to [...]


Read more →

Cement Stabilisation Sampling in Nottingham

Cement Stabilisation sampling took place on site in Nottingham last Thursday for an Academy.  The site, which is part of the existing school,  is being developed to provide a large Academy in the area along with associated sports pitches and games areas. Due to the poor ground conditions it was decided that Soil Stabilisation would [...]


Read more →

Soil Stabilisation in Leeds

Soil Stabilisation contract in Leeds. Today we have been awarded a contract to carry out the Soil Stabilisation works on a development in Leeds.  The project, which is a large commercial development, is for an existing client who we have carried out Lime Modification and Cement Stabilisation on many occasions in the past.  After an [...]


Read more →

Lime Stabilisation in York

Lime Stabilisation works start on site today on a contract in York.  The project, which is for a repeat client, will see us Lime Modify existing site material to provide a general Bulk Fill with a CBR of 5%.  Using Lime Stabilisation techniques will not only save on time, but will reduce environmental impact (less [...]


Read more →

Soil Stabilisation Sampling in Bridgewater

Following our very successful presentation last week, yesterday we carried out a sampling exercise on an extremely large contract in Bridgewater, Somerset.  Photo’s are shown below of the trial pits being dug.  From these samples of the host material was then collected by our on site laboratory technician and sent to an independent laboratory for [...]


Read more →