TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Archive for the soil stabilisation Category

Lime & Cement Stabilisation Contractor

Just a quick post to let you know about some new case studies I will be uploading to our web-site on Soil Stabilisation works we have recently completed, including: Ravenside Retail Park, Chesterfield – Carried out works for Moorhead Excavations Having successfully worked with Moorhead Excavations on a number of occasions, we were approached to [...]


Read more →

Soil Improvement & Lime Modification

Found some good information here from L’Hoist UK (who are a binder supplier to the Soil Stabilisation industry), which looks at how “lime reacts with water and clays in the soils to effect physical and chemical changes that improve the characteristics of the soils for handling and engineering purposes“. The post looks at how Lime [...]


Read more →

Soil Improvement & Cement Stabilisation

With completed contracts finishing and new jobs starting all the time, I thought it would be a good idea to update all of our social media sites yesterday with news, pictures and videos of works taking place.  This will now give you all a chance to not only read about what we do but actually [...]


Read more →

Soil Remediation News

Its been a while since I last wrote anything about Soil Remediation so thought I would have a look around and find some articles to share.  I found quite a few good articles from around the world on how Soil Remediation is being used to clean up and redevelop many sites, including:   Quad-City Botanical [...]


Read more →

Cement Stabilisation & Lime Modification Case Studies

We will be uploading some case studies, along with photos and videos today, of 2 sites where we have recently carried out Lime Modification and Soil Stabilisation / Cement Stabilisation.  The 2 sites the case studies will be for are: Soil Stabilisation – Project Dove, Nestle, Tutbury On this site we carried out almost every [...]


Read more →

Soil Stabilisation Equipment – Wirtgen

At T R Stabilisation we recognise that Wirtgen are at the forefront of technology when it comes to Soil Stabilisation equipment and this is why we predominantly use their equipment on our projects.  An article I found here http://www.constructionequipmentguide.com/Wirtgen-WR-240i-Sets-High-Standards-for-Recycling-Stabilization/20145/ from Construction Equipment Guide highlights this fact in an article about the WR 240i Recycler/Stabiliser. The article looks [...]


Read more →

Soil Stabilization new works

After successfully completing works at Telford last week, T R Stabilisation have 2 new Soil Stabilisation contracts starting this week. Ravenside Retail Park, Chesterfield The works, which we will be carrying out for Moorhead Excavations, will include a Stabilised Capping Replacement to CBR 15% and a Stabilised Sub-Base Replacement to CBR 30%. Birchwood Park, Warrington [...]


Read more →

Soil Stabilization Research

Found an article here http://www.engr.wisc.edu/news/archive/2000/Oct09.html from 2010 about research into Soil Stabilization techniques and the benefits offered by the process.  The article was written on research being carried out by 2 Civil and Environmental Engineering Professors on Soil Stabilisation. The 2 Professors were involved in 2 major projects which were examining environmentally safe and cost-effective roadbed construction.  The [...]


Read more →

Lime Stabilisation contract

Found an interesting news article here http://www.sddt.com/News/article.cfm?SourceCode=20130403cwh#.UVve4xKVDG8 about a Lime Stabilization contract in San Diego.  The article looks at the many benefits of the Lime Stabilisation process, but mainly the re-use of existing site materials.  This process meant that only 580 tonnes of quicklime was used on the site, eliminating the need to excavate and cart away [...]


Read more →

Soil Stabilization Work

Work has now finished on the Nestle Project at Tutbury where we carried out Soil Stabilisation works for O’Brien Contractors where John Sisk where the Main Contractor.  The works, which included Bulk Modification to CBR 5% and a Stabilised Capping Replacement (CBR 15%) and Sub-Base Replacement (CBR 30%) were completed on time inline with the [...]


Read more →