TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Soil Stabilisation Works – Blackburn

Below are some photos from a site where we carried out Soil Stabilisation works in Blackburn.  The specification required both Lime Modification of the fill material to achieve a CBR of not less than 5% and a Soil Stabilised (Lime and Cement) surface layer to provide a Capping Layer achieving a CBR of not less than 15%.  A laboratory technician was present throughout the works to carry out verification testing to confirm the treated areas were compliant with the prescribed specification.

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>