TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Soil Stabilisation in Oldham, Manchester

Soil Stabilisation works were carried out by ourselves on a site in Oldham recently.  The below photo’s show the site before we carried out any works and then after the Soil Stabilisation process was complete.  Lime Modification works were firstly carried out to achieve a minimum CBR of 5% to the Bulk Fill Material.  The top 300mm layer was then Lime & Cement Stabilised to give a Sub-Base Replacement with a minimum CBR of 30%.  A bitumen emulsion curing compound was then applied to the entire surface.

Site Before Soil Stabilisation Works

Site After Soil Stabilisation Works

If you would like further information on how Soil Stabilisation techniques could be utilised on any site you are currently working on or are about to commence works on then please give us a call on 01254 238700 or send us an email to sales@trstabilisation.co.uk, one of our technical team will then be happy to discuss the process with you and offer advise and suggestions as to how this process could be adopted to fit your site requirements.

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>