TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Cement Stabilisation sampling in South West

Today we are carrying out a soil sampling exercise near Bristol.  Soil samples will be collected from selected locations throughout the site and then take to a UKAS independent laboratory for a design mix to be carried out to establish the correct binder additions required (lime and cement) to achieve the required CBR’s.  Once this sampling and design mix has been completed works will commence on site.  Keep checking back for more information on this and other contracts we are currently working on.

 

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>