TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Lime Stabilisation contract

Found an interesting news article here http://www.sddt.com/News/article.cfm?SourceCode=20130403cwh#.UVve4xKVDG8 about a Lime Stabilization contract in San Diego.  The article looks at the many benefits of the Lime Stabilisation process, but mainly the re-use of existing site materials.  This process meant that only 580 tonnes of quicklime was used on the site, eliminating the need to excavate and cart away 750 trucks of material and then importing over 16,000 tonnes of aggregate.  This not only gave a huge saving in material costs, but reduced lorry movements (minimising the environmental impact and reducing disruption to the local area) and saved on time and labour.

For more information on how Soil Stabilisation and Lime Modification can benefit a scheme you are currently working on or looking at then please give us a call on 01254 238 700 or send us an email to sales@trstabilisation.co.uk.  We can arrange a site visit, provide an initial assessment of the material and give an idea of the time and costs that could be saved by using this process.

 

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>