TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Soil Stabilization Work

Work has now finished on the Nestle Project at Tutbury where we carried out Soil Stabilisation works for O’Brien Contractors where John Sisk where the Main Contractor.  The works, which included Bulk Modification to CBR 5% and a Stabilised Capping Replacement (CBR 15%) and Sub-Base Replacement (CBR 30%) were completed on time inline with the programme.  Further images, videos and a case study will be uploaded to our web-site soon.

 

Soil Stabilisation works have commenced on site today at Ercall Wood College for Moorhead Excavations, where we will be providing a Stabilised Capping Replacement to CBR 15% and Bulk Modification works to CBR 5%.  Photos and videos will be uploaded later this week as works progress.

 

For more information on the Soil Stabilisation process and how it could be applied to a site you are currently looking at or working on then please give us a call on 01254 238 700 or send us an email to sales@trstabilisation.co.uk and we would be happy to assist.

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>