TR Stabilisation

Specialist Soil Stabilisation Contractor operating throughout the UK

Soil Stabilisation Services throughout the UK

Soil Improvement using Lime – Case Study

Just uploaded a new Case Study to our web-site here http://www.trstabilisation.co.uk/case-studies/soil-stabilisation/riverside-house–centre-park–warrington.html which is on the Lime Modification works we carried out at Centre Park, Warrington.  The Case Study looks at the site and material before works were carried out, how the works were carried out (including quicklime additions) and the site after works were completed.  The case study will also be uploaded as a PDF for ease of download for future reference.  Have a look and let us know what you think.

For more information on how we can assist on your contract with Lime Modification works then please give us a call on 01254 238700 or send us an email to sales@trstabilisation.co.uk

Tags: , , , , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>